Certified Final Connect SoCal PEIR
Complete Connect SoCal PEIR (25 MB)
Executive Summary
Table of Contents
1 Introduction
2 Project Description (25 MB)
3 Environmental Setting, Impacts and Mitigation Measures
3.1 Aesthetics
3.2 Agriculture and Forestry
3.3 Air Quality
3.4 Biological Resources
3.5 Cultural Resources
3.6 Energy
3.7 Geology and Soils (15 MB)
3.8 Greenhouse Gases
3.9 Hazards and Hazardous Materials
3.10 Hydrology and Water Quality
3.11 Land Use and Planning (18 MB)
3.12 Mineral Resources
3.13 Noise
3.14 Population and Housing
3.15 Public Services
3.16 Parks and Recreation
3.17 Transportation, Traffic and Safety (13 MB)
3.18 Tribal Cultural Resources
3.19 Utilities and Service Systems
3.20 Wildfire
3.21 Cumulative Impacts
4 Alternatives
5 Other CEQA Considerations
6 List of EIR Preparers
7 Glossary
8 Introduction to the Final PEIR
9 Responses to Comments (77MB)
10 Corrections and Additions
Appendices
Appendix 1 Notice of Preparation and Comments (13 MB)
Appendix 2 Plan Project List
Appendix 3.3 Health Risk Assessment Technical Report
Appendix 3.4 Biological Resources Technical Report
Appendix 3.5 Updated Cultural Resources Technical Report
Appendix 3.7 Paleontological Resources Technical Report
Appendix 3.13 Aviation Noise Technical Report
Errata to the Final Connect SoCal PEIR
Resolution
Connect SoCal Addendum
In accordance with the California Environmental Quality Act (CEQA), SCAG has prepared the Connect SoCal PEIR Addendum to address technical refinements to the growth forecast in relation to entitlements and to address two comment letters from the Center of Biological Diversity (CBD) on May 1, 2020 and May 6, 2020. Upon evaluation, SCAG found that technical refinements resulted in minimal impacts to Connect SoCal’s performance results and Connect SoCal would continue to achieve federal air quality conformity and meet the State’s per-capita GHG reduction targets for 2020 and 2035.
The Connect SoCal PEIR Addendum was approved by the SCAG Regional Council on September 3, 2020.
- Complete Connect SoCal Addendum (26 MB)
- Table of Contents
- 1.0 Introduction
- 2.0 Technical Refinements to the Plan and Environmental Effects
- 3.0 PEIR Clarifications
- 4.0 Mitigation Measures
- 5.0 List of Preparers
- Appendix A – Responses to Comments