2019 Adopted FTIP

Overview
2019 FTIP report cover image

The Federal Transportation Improvement Program (FTIP) is a listing of multi-modal transportation projects proposed over a six-year period for the SCAG region. The projects include highway improvements, transit, rail and bus facilities, high occupancy vehicle lanes, active transportation, signal synchronization, intersection improvements, freeway ramps, etc. SCAG produces a biennial FTIP update for the region on an even-year cycle.

The FTIP is prepared to implement projects and programs listed in the Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS) and is developed in compliance with state and federal requirements. The six County Transportation Commissions (Imperial, Los Angeles, Orange, Riverside, San Bernardino, and Ventura) in the SCAG region have the responsibility under State law of proposing their county program, using current RTP/SCS policies, programs, and projects as a guide, from among submittals by cities and local agencies. The locally prioritized lists of projects are forwarded to SCAG for review. From their lists, SCAG develops the FTIP based on consistency with the current RTP/SCS, inter-county connectivity, financial constraint and conformity determination.

Learn more, download the FTIP factsheet.

Adopted by SCAG’s Regional Council on September 6, 2018

FEDERAL APPROVAL LETTER — December 17, 2018

EXECUTIVE SUMMARY — Volume I of III

TECHNICAL APPENDIX — Volume II of III
( 701 pages, 18.8 MB ) This is a large file, download may take some time.

FINAL 2019 FTIP GUIDELINES

DOWNLOAD BY SECTION

PROJECT LISTING – VOLUME III OF III PART A

PROJECT LISTING — Volume III of III PART A
( 614 pages, 6.9 MB ) This is a large file, download may take some time.

DOWNLOAD BY SECTION

State Highway Project Listings

Local Highway Project Listings

Transit Project Listings

Section 5307, 5337 and 5339 Program Projects

100% Prior Years

COMPLETED PROJECTS

PROJECT LISTING – VOLUME III OF III PART B

PROJECT LISTING — Volume III of III PART B
Grouped Projects Detailed Backup Listings
( 236 pages, 5.0 MB )

Section 5307, 5337 and 5339 Including Amendment 1

Section 5307, 5337 and 5339 Including Amendments 1-2

Section 5307, 5337 and 5339 Including Amendments 1-5

Section 5307, 5337 and 5339 Including Amendments 1-11

Section 5307, 5337 and 5339 Including Amendments 1-11 and 13-16

Section 5307, 5337 and 5339 Including Amendments 1-30

Section 5307, 5337 and 5339 Including Amendments 1-32