Our Work
- Connect SoCal
- Inclusion, Diversity, Equity & Awareness
- Programs & Projects
- Housing
- Economy & Demography
- Federal & State Compliance
- Sustainability
- Transportation
- Active Transportation
- Aviation Program
- Regional Pilot Initiatives Program
- The Future Communities Initiative
- Transportation Demand Management
- Transit Program
- FreightWorks
- Passenger Rail Program
- Corridor Planning
- Transportation Safety
- Transportation Finance
- Intelligent Transportation Systems
- Southern California Transportation Study
- Local Resources
- Funding & Programming
- Legislation & Advocacy
- Publications & Reports
2019 Federal Transportation Improvement Program

The Federal Transportation Improvement Program (FTIP) is a listing of multi-modal transportation projects proposed over a six-year period for the SCAG region. The projects include highway improvements, transit, rail and bus facilities, high occupancy vehicle lanes, active transportation, signal synchronization, intersection improvements, freeway ramps, etc. SCAG produces a biennial FTIP update for the region on an even-year cycle.
The FTIP is prepared to implement projects and programs listed in the Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS) and is developed in compliance with state and federal requirements. The six County Transportation Commissions (Imperial, Los Angeles, Orange, Riverside, San Bernardino, and Ventura) in the SCAG region have the responsibility under State law of proposing their county program, using current RTP/SCS policies, programs, and projects as a guide, from among submittals by cities and local agencies. The locally prioritized lists of projects are forwarded to SCAG for review. From their lists, SCAG develops the FTIP based on consistency with the current RTP/SCS, inter-county connectivity, financial constraint and conformity determination.
Learn more, download the FTIP factsheet.
Adopted by SCAG’s Regional Council on September 6, 2018
FEDERAL APPROVAL LETTER — December 17, 2018
EXECUTIVE SUMMARY — Volume I of III
TECHNICAL APPENDIX — Volume II of III
( 701 pages, 18.8 MB ) This is a large file, download may take some time.
DOWNLOAD BY SECTION
- Section I: Conformity Requirements and Findings
- Section II: Regional Emissions Analysis
- Section III: Timely Implementation of TCMs
- Section IV: Financial Plan
- Section V: Environmental Justice & Public Notifications
- Section VI: Congestion Management Process
- Section VII: Performance Measures
- Section VIII: SCAG's Response to Comments
PROJECT LISTING – VOLUME III OF III PART A
PROJECT LISTING — Volume III of III PART A
( 614 pages, 6.9 MB ) This is a large file, download may take some time.
DOWNLOAD BY SECTION
- State Highway Project Listings
- Local Highway Project Listings
- Transit Project Listings
- Section 5307, 5337 and 5339 Program Projects
- 100% Prior Years
- COMPLETED PROJECTS
PROJECT LISTING – VOLUME III OF III PART B
PROJECT LISTING — Volume III of III PART B
Grouped Projects Detailed Backup Listings
( 236 pages, 5.0 MB )
- Section 5307, 5337 and 5339 Including Amendment 1
- Section 5307, 5337 and 5339 Including Amendments 1-2
- Section 5307, 5337 and 5339 Including Amendments 1-5
- Section 5307, 5337 and 5339 Including Amendments 1-11
- Section 5307, 5337 and 5339 Including Amendments 1-11 and 13-16
- Section 5307, 5337 and 5339 Including Amendments 1-30
- Section 5307, 5337 and 5339 Including Amendments 1-32

The table below provides information on the status of the 2019 Federal Transportation Improvement Program in the SCAG Region.
Effective February 14, 2012, Caltrans delegated to SCAG the authority to approve Administrative Modifications to the FSTIP. The delegation letter is located on the following link: View Caltrans delegation letter.
NUMBER | TYPE | COUNTIES | SCAG APPROVAL | CALTRANS APPROVAL | FTA/FHWA APPROVAL |
---|---|---|---|---|---|
19-32 | Administrative Modification | Los Angeles, Orange, Riverside, Various | 3/05/21 | ||
19-31 | Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino | 1/29/21 | 2/03/21 | 2/16/21 |
19-30 | Administrative Modification | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Various, Ventura | 12/28/20 | ||
19-29 | Amendment | Los Angeles, Orange, Riverside, San Bernardino | 12/04/20 | 12/11/20 | 12/21/20 |
19-28 | Administrative Modification | Los Angeles, Orange, Riverside, San Bernardino, Various | 10/16/20 | ||
19-27 | Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura | 10/13/20 | 10/14/20 | 11/06/20 |
19-26 | Administrative Modification | Los Angeles, Orange, San Bernardino, Ventura | 08/20/20 | ||
19-25 | Amendment | Imperial | 08/11/20 | 08/13/20 | 08/18/20 |
19-24 | Administrative Modification | Los Angeles, Orange, Riverside, San Bernardino, Ventura, Various | 08/11/20 | ||
19-23 | Amendment | Imperial, Los Angeles, Orange, Riverside | 07/10/20 | 07/15/20 | 07/31/20 |
19-22 | Administrative Modification | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura | 06/04/20 | ||
19-21 | Administrative Modification | Riverside | 04/29/20 | ||
19-20 | Amendment | Los Angeles, Orange, Riverside, San Bernardino, Ventura | 05/29/20 | 06/09/20 | 06/19/20 |
19-19 | Amendment | Imperial, Los Angeles, San Bernardino | 04/21/20 | 04/27/20 | 05/07/20 |
19-18 | Administrative Modification | 04/06/20 | |||
19-17 | Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura | 03/10/20 | 03/11/20 | 04/01/20 |
19-16 | Administrative Modification | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Various, Ventura | 12/31/19 | ||
19-15 | Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura | 11/22/19 | 11/25/19 | 11/25/19 |
19-14 | Administrative Modification | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Various, Ventura | 11/18/19 | ||
19-13 | Administrative Modification | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Various, Ventura | 11/12/19 | 11/14/19 | 11/25/19 |
19-12 | 2020 RTP Consistency Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura | 05/07/20 | 05/19/20 | 06/05/20 |
19-11 | Administrative Modification | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura | 08/29/19 | ||
19-10 | Administrative Modification | Los Angeles, Ventura | 07/26/19 | ||
19-09 | Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura | 08/09/19 | 08/15/19 | 09/03/19 |
19-08 | Administrative Modification | Los Angeles, Orange, Riverside, San Bernardino, Various, Ventura | 06/13/19 | ||
19-07 | Amendment | Los Angeles, Orange, Riverside, San Bernardino, Various, Ventura | 05/16/19 | 05/22/19 | 06/06/19 |
19-06 | Amendment | San Bernardino | 04/02/19 | 04/02/19 | 04/10/19 |
19-05 | Administrative Modification | Los Angeles, Orange, Riverside, San Bernardino, Various, Ventura | 03/21/19 | ||
19-04 | Administrative Modification | San Bernardino, Ventura | 02/19/19 | ||
19-03 | Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura, Various | 02/20/19 | 03/01/19 | 03/19/19 |
19-02 | Administrative Modification | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura, Various | 12/20/18 | ||
19-01 | Amendment | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura, Various | 10/01/18 | 11/02/18 | 12/17/18 |
19-00 | Formal Adoption of the 2019 FTIP | Imperial, Los Angeles, Orange, Riverside, San Bernardino, Ventura, Various | 09/17/18 | 11/02/18 | 12/17/18 |

This page contains comparison reports of all projects submitted in an amendment which require posting for a 10-day public review prior to the amendments being submitted to the approving agencies (Caltrans, FHWA and FTA). Along with the comparison reports, the link also contains the Financial Plan and Conformity Determination report associated with the amendment.
SCAG is relying on the public participation process for the FTIP to satisfy FTA public participation requirements for the transit Program of Projects (POP). The public notice of public participation activities and the time established for public review of and comments on the FTIP will satisfy the POP requirements.
Subject to revisions to address comments received during the public review period, the proposed FTIP Amendments will be the final program unless amended, and a final notice will not be published.

This page contains all the Federally Approved project listings for the current FTIP. The current version is listed first, therefore, supersedes all previous versions. The project listings are broken down by county and system (local, state, transit).
Grouped Projects are essentially fund reservations that include a list of projects that are grouped by function, work type, and/or geographic area (23 CFR Part 450.324(f)). Usually, grouped projects are for road rehabilitation, safety, or minor improvements that do not add capacity, require air quality conformity determination, or are deemed transportation control measures (TCMs).
Detailed project listing (back-up listing) for a grouped project that is programmed or amended in an FTIP contain individual project information with sufficient description to accurately identify scope, implementing agency, location, limits of the project (if any), program year and the total cost. Total cost of the projects (including funding for all project phases) from the detailed project listing shall be programmed under the “Construction” phase in the FTIP.
The Grouped Projects Detailed Backup Listings (by County) for the 2019 FTIP are below:
Imperial County
Los Angeles County
Orange County
Riverside County
San Bernardino County
Ventura County
Various County (including HSIP - SCAG015)

The Federal Transportation Improvement Program (FTIP) is a listing of multi-modal transportation projects proposed over a six-year period for the SCAG region. The projects include highway improvements, transit, rail and bus facilities, high occupancy vehicle lanes, active transportation, signal synchronization, intersection improvements, freeway ramps, etc. SCAG produces a biennial FTIP update for the region on an even-year cycle.

The table below provides information on the status of the 2019 Federal Transportation Improvement Program in the SCAG Region.
Effective February 14, 2012, Caltrans delegated to SCAG the authority to approve Administrative Modifications to the FSTIP. The delegation letter is located on the following link: View Caltrans delegation letter.

This page contains comparison reports of all projects submitted in an amendment which require posting for a 10-day public review prior to the amendments being submitted to the approving agencies (Caltrans, FHWA and FTA). Along with the comparison reports, the link also contains the Financial Plan and Conformity Determination report associated with the amendment.

This page contains all the Federally Approved project listings for the current FTIP. The current version is listed first, therefore, supersedes all previous versions. The project listings are broken down by county and system (local, state, transit).
Grouped Projects are essentially fund reservations that include a list of projects that are grouped by function, work type, and/or geographic area (23 CFR Part 450.324(f)). Usually, grouped projects are for road rehabilitation, safety, or minor improvements that do not add capacity, require air quality conformity determination, or are deemed transportation control measures (TCMs).
Detailed project listing (back-up listing) for a grouped project that is programmed or amended in an FTIP contain individual project information with sufficient description to accurately identify scope, implementing agency, location, limits of the project (if any), program year and the total cost. Total cost of the projects (including funding for all project phases) from the detailed project listing shall be programmed under the “Construction” phase in the FTIP.