2023 Federal Transportation Improvement Program

Overview
Overview

2023 Adopted FTIP

2023 FTIP Cover

The Federal Transportation Improvement Program (FTIP) is a listing of multi-modal transportation projects proposed over a six-year period for the SCAG region. The projects include highway improvements, transit, rail and bus facilities, high occupancy vehicle lanes, active transportation, signal synchronization, intersection improvements, freeway ramps, etc. SCAG produces a biennial FTIP update for the region on an even-year cycle.

The FTIP is prepared to implement projects and programs listed in the Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS) and is developed in compliance with state and federal requirements. The six County Transportation Commissions (Imperial, Los Angeles, Orange, Riverside, San Bernardino, and Ventura) in the SCAG region have the responsibility under State law of proposing their county program, using current RTP/SCS policies, programs, and projects as a guide, from among submittals by cities and local agencies. The locally prioritized lists of projects are forwarded to SCAG for review. From their lists, SCAG develops the FTIP based on consistency with the current RTP/SCS, inter-county connectivity, financial constraint and conformity determination.

Learn more, download the 2023 FTIP Factsheet.

Adopted by SCAG’s Regional Council on October 6, 2022 | Resolution No. 22-647-2
FEDERAL APPROVAL LETTER - December 16, 2022
2023 FTIP SCAG Transmittal Letter

EXECUTIVE SUMMARY — Volume I of III
Also available in: Chinese | Korean | Spanish | Vietnamese

TECHNICAL APPENDIX — Volume II of III
(465 pages, 8.4 MB)

PROJECT LISTING - Volume III of III PART A
(588 pages, 4 MB)

PROJECT LISTING — Volume III of III PART B
(399 pages, 6.4 MB)

Overview

2023 Status of Amendments & Approvals

Status Information IconThe table below provides information on the status of the 2023 Federal Transportation Improvement Program in the SCAG Region.

Effective February 14, 2012, Caltrans delegated to SCAG the authority to approve Administrative Modifications to the FSTIP. The delegation letter is located on the following link: View Caltrans delegation letter.

Overview

2023 Proposed Amendments

Amendments IconThis page contains comparison reports of all projects submitted in an amendment which require posting for a 10-day public review prior to the amendments being submitted to the approving agencies (Caltrans, FHWA and FTA). Along with the comparison reports, the link also contains the Financial Plan and Conformity Determination report associated with the amendment.

Overview

2023 Approved FTIP

Approved IconThis page contains all the Federally Approved project listings for the current FTIP. The current version is listed first, therefore, supersedes all previous versions. The project listings are broken down by county and system (local, state, transit).

Overview

2023 Grouped Projects Detailed Backup Listings (by County)

Grouped Projects IconGrouped Projects are essentially fund reservations that include a list of projects that are grouped by function, work type, and/or geographic area (23 CFR Part 450.324(f)). Usually, grouped projects are for road rehabilitation, safety, or minor improvements that do not add capacity, require air quality conformity determination, or are deemed transportation control measures (TCMs).