Grouped Projects are essentially fund
reservations that include a list of projects that are grouped by
function, work type, and/or geographic area (23 CFR Part
450.324(f)). Usually, grouped projects are for road
rehabilitation, safety, or minor improvements that do not add
capacity, require air quality conformity determination, or are
deemed transportation control measures (TCMs).
Detailed project listing (back-up listing) for a grouped project
that is programmed or amended in an FTIP contain individual
project information with sufficient description to accurately
identify scope, implementing agency, location, limits of the
project (if any), program year and the total cost. Total cost of
the projects (including funding for all project phases) from the
detailed project listing shall be programmed under the
“Construction” phase in the FTIP.
The Grouped Projects Detailed Backup Listings (by County) for the
2023 FTIP are below:
Imperial County
Los Angeles County
Orange County
Riverside County
San Bernardino County
Ventura County
Various Counties (including HSIP - SCAG015)